In a function organised in Khajuraho, Madhya Pradesh on 25 December 2024, the Prime Minister Narendra Modi laid the foundation stone of the Ken-Betwa National River Linking Project , inaugurated Omkareshwar Floating Solar Project and performed the Bhoomi Pujan of over 1,100 Atal Gram Sushasan Bhawans.
The function was organised to mark the 100th birth anniversary of the 10th Prime Minister of India, Atal Bihari Vajpayee.
The Prime Minister also released a stamp and coin in memory of former Prime Minister Atal Bihari Vajpayee.
Since 2014 the central government has observed 25th December as the Good Governance Day.
Mangubhai Patel,Governor of Madhya Pradesh, Dr Mohan Yadav Chief Minister of Madhya Pradesh and Union Jal Shakti Minister CR Patel were also present at the event.
The Ken-Betwa national river interlinking project is the first of the 30 rivers to be interlinked under the central government’s ‘Interlinking of Rivers under the National Perspective Plan”.
The plan proposes to interlink 30 rivers -16 Peninsular and 14 Himalayan rivers ,so as to transfer the surplus water of a river to a water deficit river. It is expected to solve the problem of flooding, drought and provide assured drinking water and irrigation facilities,
The project is being implemented by the National Water Development Agency under the Union Ministry of Jalshakti.
The Central government and the state governments of Uttar Pradesh and Madhya Pradesh signed a memorandum of understanding (MoU) on March 22, 2021 for the implementation of Ken-Betwa link national Project.
To implement the project a Special Purpose Vehicle (SPV) called Ken-Betwa Link Project Authority (KALPA) has been set up.
The project seeks to transfer surplus water from Ken river to Betwa through the construction of Daudhan Dam and a canal linking the two rivers, the Lower Orr Project, Kotha Barrage -and Bina Complex Multipurpose Project.
It will generate 103 MW of hydel power and 27 MW of solar power.
The Project will be developed in two phases.
Under Phase-I
Phase-2
The 90 MW Omkareshwar floating solar project was commissioned by the SJVN Limited in August 2024. It was officially inaugurated by Prime Minister Modi on 25 December 2024.
The Omkareshwar Floating Solar Project is built on River Narmada and is located in the Khandwa District of Madhya Pradesh.
The Omkareshwar Floating Solar Project is in the largest floating solar park of India, the Omkareshwar Floating Solar Park.